我公司承建的廣東省汕頭市澄海潔源生活垃圾焚燒發(fā)電項(xiàng)目三期煙氣凈化工程于2021年09月10日通過72+24小時(shí)試運(yùn)行。 The FGC project contracted by Huaxing-east for phase III of Chenghai Jieyuan waste-to-energy plant in Shantou, Guangdong passed 72+24 hours trial operation on Sept. 10, 2021.
該項(xiàng)目一、二期原有2x225t/d+1x320t/d三條焚燒線,本期新建規(guī)模1x750t/d+1x20MW汽輪機(jī)+1x22MW發(fā)電機(jī)。煙氣處理采用“旋轉(zhuǎn)霧化半干法脫酸+干法(碳酸氫鈉)脫酸+活性炭吸附+布袋除塵器+飛灰輸送、存儲(chǔ)及穩(wěn)定化工藝”的煙氣凈化工藝,為我司EPC工程。 The phase I & II for the project have three incineration lines of 2x225 t/d and 1x320 t/d. Phase III built 1x750 t/d + 1x20 MW steam turbine + 1x22 MW generator. The FGC adopts the process of "rotary atomization semi-dry deacidification + dry deacidification with sodium bicarbonate + activated carbon adsorption + bag filter + fly ash conveying, storage and stabilization", which is an EPC project of Huaxing.
華星東方在廣東省的業(yè)績涵蓋包括:東莞駿業(yè)、汕頭潮南、普寧、惠陽、肇慶、汕頭澄海、高州、中山等多個(gè)項(xiàng)目。 The achievements of HXET in Guangdong Province include Dongguan Junye, Shantou Chaonan, Puning, Huiyang, Zhaoqing, Shantou Chenghai, Gaozhou, Zhongshan, etc.