我公司承建的遼寧省葫蘆島市生活垃圾焚燒發(fā)電項(xiàng)目煙氣凈化工程于2023年05月08日通過(guò)72+24小時(shí)試運(yùn)行。 The flue gas cleaning (FGC) project undertaken by Huaxing-east for the waste incineration power plant in Huludao, Liaoning has passed 72+24 hours of trial operation on May 8, 2023.
該項(xiàng)目總規(guī)模為日處理生活垃圾1200噸,配置2×600t/d機(jī)械爐排焚燒爐+1×25MW中溫中壓凝汽式汽輪機(jī)發(fā)電機(jī)組。煙氣處理采用“半干法(旋轉(zhuǎn)噴霧反應(yīng)塔)+干法(噴射氫氧化鈣)+活性炭噴射+布袋除塵器+飛灰輸送及存儲(chǔ)”的煙氣凈化工藝,為我司EPC工程。 The plant process capacity is 1200 t/d, equiped with 2×600 t/d mechanical grate and 1×25 MW medium temperature and pressure condensing steam turbine. The FGC process applied "semi-dry rotary spray absorber + dry injection of calcium hydroxide + activated carbon injection + bag filter + fly ash conveying and storage". It's an EPC project of Huaxing.
華星東方在遼寧省的業(yè)績(jī)涵蓋包括:沈陽(yáng)鐵西、沈陽(yáng)康平、大連莊河、鞍山海城、葫蘆島、朝陽(yáng)凌源等多個(gè)項(xiàng)目。 Huaxing-east's performances in Liaoning Province include Tiexi in Shenyang, Kangping in Shenyang, Zhuanghe in Dalian, Haicheng in Anshan, Huludao, and Lingyuan in Chaoyang.