我公司承建的云南省昆明市西山區(qū)城市生活垃圾焚燒發(fā)電改擴(kuò)建項(xiàng)目煙氣凈化工程于2021年12月18日開(kāi)工建設(shè),目前反應(yīng)塔已安裝完成。
The flue gas cleaning (FGC) project constructed by Huaxing East for the reconstruction and expansion of waste incineration power plant in Xishan, Kunming was started on December 18, 2021. The installation of the reaction tower has been completed.
工程整體效果圖
該項(xiàng)目建設(shè)1條750 t/d生活垃圾焚燒處理線,煙氣處理采用SNCR+旋轉(zhuǎn)噴霧半干法脫酸+干法噴射+活性炭吸附+布袋除塵器+飛灰輸送、儲(chǔ)存及穩(wěn)定化工藝,為我司EPC工程。
The plant built a 750 t/d incineration line. FGC applies SNCR + rotary spray semi-dry deacid + dry injection + activated carbon adsorption + bag filter + fly ash conveying, storage and stabilization process. It is an EPC project of Huaxing.
華星東方在云南省的業(yè)績(jī)涵蓋包括:麗江、嵩明二期,景洪,西疇,昆明西山,昆明五華、紅河哈尼族彝族自治州等多個(gè)項(xiàng)目。
Huaxing East's achievements in YunNan Province include:Lijiang, Song Ming phase ii, Jinghong, Xichou, Kunming Xishan, Kunming Wuhua, Honghe Hani and Yi Autonomous Prefecture etc.