The flue gas cleaning (FGC) project undertaken by Huaxing East for Longnan (Sannan) waste incineration power plant in Jiangxi Province started construction
2022.12.23
The FGC project undertaken by Huaxing for Longnan (Sannan) Waste-to-Energy plant in Jiangxi Province was commenced on November 10, 2022.
The total scale of the project is 1000 tons / day of municipal solid waste, collaboratively treating kitchen waste, construction waste and other waste. The scale of the 1st phase is 500t/d of municipal waste, equipped with 1x12 MV steam turbine generator, and the annual treatment capacity can be 182,500 tons. The FGC process applied "in-furnace SNCR + semi-dry rotary spray + dry method with dry powder injection + activated carbon adsorption + bag filter + fly ash conveying, storage and stabilization process". It is an EPC project of Huaxing.
Huaxing's achievements in Jiangxi Province include Jiujiang Duchang, Nanchang Hongcheng, Yichun , Nanchang Quanling, Yichun Fengcheng, Ganzhou Nankang , Longnan, etc.
Copyright ? 2021 Jiangsu Huaxing Dongfang Electric Power Environmental Protection Technology Co., Ltd. All Rights Reserved. 備案號(hào):蘇ICP備16018214號(hào)