欧美日韩一区二区三区高清不卡,亚洲欧美日韩中文字幕在线一,亚洲国产欧美在线观看,老司机午夜永久在线观看,国产欧美一区二区三区免费看

<dfn id="tub0w"><nobr id="tub0w"></nobr></dfn>
<pre id="tub0w"><optgroup id="tub0w"></optgroup></pre>
  • <strong id="tub0w"><center id="tub0w"></center></strong>

  • EN
    The flue gas cleaning (FGC) project contracted by Huaxing-east for phase III of Chenghai Jieyuan waste-to-energy plant in Shantou, Guangdong passed 72+24 hours trial operation
    2023.03.27
    The FGC project contracted by Huaxing-east for phase III of Chenghai Jieyuan waste-to-energy plant in Shantou, Guangdong passed 72+24 hours trial operation on Sept. 10, 2021.
    The phase I & II for the project have three incineration lines of 2x225 t/d and 1x320 t/d. Phase III built 1x750 t/d + 1x20 MW steam turbine + 1x22 MW generator. The FGC adopts the process of "rotary atomization semi-dry deacidification + dry deacidification with sodium bicarbonate + activated carbon adsorption + bag filter + fly ash conveying, storage and stabilization", which is an EPC project of Huaxing.
    The achievements of HXET in Guangdong Province include Dongguan Junye, Shantou Chaonan, Puning, Huiyang, Zhaoqing, Shantou Chenghai, Gaozhou, Zhongshan, etc.
    For more information, please click or scan below!

    Follow us!