欧美日韩一区二区三区高清不卡,亚洲欧美日韩中文字幕在线一,亚洲国产欧美在线观看,老司机午夜永久在线观看,国产欧美一区二区三区免费看

<dfn id="tub0w"><nobr id="tub0w"></nobr></dfn>
<pre id="tub0w"><optgroup id="tub0w"></optgroup></pre>
  • <strong id="tub0w"><center id="tub0w"></center></strong>

  • EN
    The FGC project undertaken by Huaxing for the WTE plant in Yanzhou, Jining in Shandong Province passed the 72 + 24 hours trial operation
    2022.09.01

    The flue gas cleaning (FGC) project undertaken by Huaxing East for the municipal waste incineration plant in Yanzhou Jining, Shandong passed the 72 + 24 hours trial operation on August 5, 2022.



    The daily capacity of the plant is 1500 tons, the annual treatment capacity is 547,500 tons. A set of 32 MW (1×20MW+1×12MW) steam turbine generator is equiped. FGC adopts the process of SNCR with urea (not in Huaxing scope) + semi-dry with slaked lime slurry (not in Huaxing scope) + dry with slaked lime injection (not in Huaxing scope) + activated carbon injection (not in Huaxing scope) + bag filter (not in Huaxing scope) + SGH + SCR with urea + Catalyst (MHI). It is an EP project of Huaxing.





    The achievements of Huaxing in Shandong include Zhucheng, Weifang phase I & II, Weifang Gaomi, Muping, Tai'an, Gaomi, Zichuan, Linyi phase II, Xiaojianxi, Huangdao, Linzi phase I & II, Linyi Lanshan, Yishui phase II, Wendeng, Laixi, Dezhou, Longkou, Yiyuan, Changle, Shanghe, Yanzhou, Zaozhuang, Taierzhuang, Zhangqiu phase II, Laizhou, etc.






    For more information, please click or scan below!
    Follow us!