我公司承建的河北省唐山市曹妃甸生活垃圾焚燒發(fā)電項目煙氣凈化工程于2022年06月14日通過72+24小時試運行。 The FGC project constructed by Huaxing for Caofeidian waste incineration power plant in Tangshan, Hebei passed 72+24 hours trial operation on June 14, 2022.
該項目建設日均處理生活垃圾500t/d,配置1×500t/d機械爐排爐+1×10MW凝汽式汽輪發(fā)電機組。煙氣處理采用“SNCR(爐內噴氨水)(非本次合同范圍內)+半干反應塔(石灰漿溶液)(非本次合同范圍內)+干法(消石灰干粉)(非本次合同范圍內)+活性炭噴射吸附(非本次合同范圍內)+小蘇打研磨+布袋除塵工藝 (非本次合同范圍內)+SGH(蒸汽-煙氣換熱)+SCR(氨水)+催化劑(三菱重工)”的煙氣凈化工藝,為我司EPC工程。 The plant has an average waste treatment capacity of 500 t/d, equiped with 1 × 500 t/d mechanical grate + 1 × 10 MW condensate steam turbine generator. The FGC adopted the process of "SNCR with in-furnace ammonia solution injection (not the scope of contract) + semi-dry reaction tower with lime slurry solution (not the scope of contract) + dry method with lime powder (not the scope of contract) + activated carbon injection adsorption (not the scope of contract) + activated carbon injection adsorption (not the scope of contract) + sodium bicarbonate grinding + bag filter (not the scope of contract)+ SGH (steam-gas heat exchange) + SCR with ammonia solution+ Catalyst (MHI)". It is an EPC project of Huaxing.
鑒于新發(fā)布的DB13/ 5325—2021河北省《生活垃圾焚燒大氣污染控制標準》要求新建生活垃圾焚燒爐污染物執(zhí)行新標準。而曹妃甸焚燒廠在最初的建設規(guī)劃中未及時簽訂SCR系統(tǒng),在項目即將投產階段,我司承接了該項目的SCR系統(tǒng),因此該項目在河北地區(qū)具有非常典型的工期示范效應。 In view of the newly issued DB13/5325-2021 Standard for “Air Pollution Control on Municipal Waste Incineration” in Hebei Province requires lower pollutants from newly-built waste incinerators; however, Caofeidian incineration plant did not sign the SCR system in time in the initial construction plan. At the stage when the plant is about to be put into production, Huaxing undertook the SCR system for the plant. Therefore, the plant demostrated a very typical construction period in Hebei.
作為國內專業(yè)的頭部煙氣凈化系統(tǒng)供應商,華星東方憑借自有工廠分步設計,分步發(fā)貨,分步安裝的優(yōu)勢,以及日本三菱重工協(xié)同設計、制造和檢驗的國際化分工生產步驟,為該項目的短時間內投產提供了有利的硬件保證。為確保曹妃甸生活垃圾焚燒發(fā)電項目煙氣凈化如期達標投產,華星東方自2022年03月01日進場施工之日起,通過工廠化整體制作,合理發(fā)貨計劃,倒排工期,優(yōu)化施工組織設計,晝夜施工,交叉作業(yè),工程質量監(jiān)管到位、安全措施到位,歷時三個月圓滿并提前保質保量的完成了既定目標交付項目。 As a domestic professional leading supplier of flue gas cleaning (FGC) system, Huaxing East has provided favorable and guaranteed hardware for the plant to be put into production in a limited period by virtue of its own factory's advantages of step-by-step design, delivery, and installation, as well as the international division of production steps of Mitsubishi Heavy Industries' collaborative design, manufacturing, and inspection. To ensure the FGC for Caofeidian WTE plant is put into operation as scheduled, from the date of entering the site for construction on March 1, 2022, Huaxing successfully completed the delivery objectives in three months with quality and quantity guaranteed ahead of schedule by means of factory integrated production, reasonable delivery plan, inverted schedule, optimized construction organization design, shifting workgroup, cross operation, quality supervision, and safety measures.
通過河北地標提升的短期內改造,作為中國環(huán)保排放控制水平提高的一個縮影,展示了華星東方在低溫SCR和專用低溫催化劑供應方面的深厚底蘊。在多年的工程實踐中,建立眾多自有核心制造裝備工廠是一家工程公司對性能,交期,品質和售后服務的核心保證能力。同一時期,華星東方在短期內為:沙河,張家口北部,圍場,定州,保定,曹妃甸,灤州,唐山,石家莊等地的客戶提供了SCR的快速交付技改服務。 Through short-term transformation complying the new Hebei provincial standard, as a microcosm of the improvement of China's air protection & emission control, the SCR project shows the profund accumulation of Huaxing in the supply of SCR and exclusive low-temperature catalyst. In many years of engineering practice, the establishment of multiple self-owned core equipment manufacturing plants is the core guarantee capability of an engineering company for performance, delivery date, quality, and after-sales service. Meanwhile, Huaxing delivered fast SCR and technical transformation services for customers in Shahe, North Zhangjiakou, Weichang, Dingzhou, Baoding, Caofeidian, Luanzhou, Tangshan, Shijiazhuang, etc. within limited time.
華星人秉承“誠信、創(chuàng)新、專業(yè)、高效”的八字方針,始終保持著昂揚的斗志不負使命。華星東方作為行業(yè)大氣治理領域的先進企業(yè),自南京江北項目開始為行業(yè)提供了成功的低溫SCR應用設計模板,并正在起草和編寫垃圾焚燒領域的低溫SCR設計規(guī)程,公司一直致力于對更先進排放技術的開發(fā)和實踐,作為行業(yè)的重要參與者之一,華星東方已經累計為200多座焚燒廠,近500條焚燒線提供了煙氣凈化設施、設計和工程服務。其中包含SCR系統(tǒng)的為70余座焚燒廠,100多條焚燒線。 Adhering to the belief of "Integrity, Innovation, Professionalism, and Efficiency", Huaxing stuff have always maintained ethics and fulfilled mission. As an advanced enterprise in the field of air governance in the industry, Huaxing East has provided the industry with a successful design template for low-temperature SCR applications since the Nanjing Jiangbei Plant, and is drafting and preparing a low temperature SCR design procedure in the field of waste incineration. Huaxing has been committed to the development and practice of more advanced emission technologies. As an important participant in the industry, Huaxing has accumulated FGC references for more than 200 incineration plants, nearly 500 incineration lines, providing FGC equipment, design, and engineering services. Among them, there are more than 70 incineration plants and more than 100 incineration lines equiped with SCR system.
華星東方在河北省的業(yè)績涵蓋包括:石家莊夏能炘、衡水、曹妃甸、圍場、保定一期、二期、順平、唐山一期、二期、張家口北、固安、香河、定州、滄州一期、石家莊、安平、灤州、沙河等多個項目。 The achievements of Huaxing East in Hebei Province include Xia Nenxin of Shijiazhuang, Hengshui, Caofeidian, Weichang, Baoding phase I & II, Shunping, Tangshan phase I & II, North Zhangjiakou, Gu'an, Xianghe, Dingzhou, Cangzhou phase I, Shijiazhuang, Anping, luanzhou, Shahe, etc.