我公司承建的江西省贛州市南康生活垃圾焚燒發(fā)電項目煙氣凈化工程于2022年07月31日開工建設。 The FGC project undertaken by Huaxing-east for the Nankang waste incineration power plant in Ganzhou, Jiangxi has began construction on July 31, 2022.
該項目總規(guī)模為2000t/d,分兩期建設。一期(本期)工程日處理生活垃圾1000t,建設2條處理能力500t/d的生活垃圾爐排爐焚燒線,配套安裝1臺額定30MW的凝汽式汽輪發(fā)電機組(預留二期擴建1000t/d生產線場地)。煙氣處理采用“爐內SNCR+半干法(旋轉噴霧)+干法(干粉噴射)+活性炭吸附+袋式除塵+飛灰輸送、儲存及穩(wěn)定化工藝”的煙氣凈化工藝,為我司EPC工程。 The plant total capacity is 2000 t/d and will be constructed in 2 phases. The 1st (current) phase of the plant has a treatment capacity of 1000 t/d of municipal solid waste. Two 500 t/d incineration lines will be constructed, along with the installation of one condensing steam turbine generator with rated power 30 MW (expansion of 1000 t/d production line for 2nd phase reserved). The FGC process applied "In-furnace SNCR + semi-dry rotary spray + dry powder injection + activated carbon adsorption + bag filter + fly ash conveying, storage and stabilization". It is an EPC project of Huaxing.
華星東方在江西省的業(yè)績涵蓋包括:九江都昌、南昌洪城、宜春、南昌泉嶺、宜春豐城、贛州南康、龍南、景德鎮(zhèn)等多個項目。 Huaxing's achievements in Jiangxi Province include Jiujiang Duchang, Nanchang Hongcheng, Yichun, Nanchang Quanling, Yichun Fengcheng, Ganzhou Nankang, Longnan, Jingdezhen, etc.